黄色AV免费在线观看,爆插白虎逼,国产av一级二级,日韩精品成人一区二区在线

中文
News
News Center
News
學(xué)習(xí)專業(yè)散熱風(fēng)扇知識(shí),了解最新行業(yè)動(dòng)態(tài)
News
當(dāng)前位置: 首頁 News Industry trends What should I pay attention to when purchasing the cooling fan in the electrical control cabinet?
What should I pay attention to when purchasing the cooling fan in the electrical control cabinet?

Industry trends| 2022-12-06|毅榮川電子

First of all, develop a new axial flow cooling fan, which is generally composed of 5 people, including structure, electronics, procurement, IE, and sample staff. During the process, it is necessary to draw a 3D outline drawing for the customer's confirmation, make the outline frame of the hand board, the leaf, and the hand board fan for the customer's confirmation, confirm the mold opening, mold test, and production. It will take about 40 days to complete these works.

      Therefore, develop a productAxial cooling fanFirst of all, we need to have a certain amount. Generally, the monthly amount is not less than 10000 units. Because so much manpower and material resources are invested. If the amount is too small, it will undoubtedly waste a lot of manpower for the production plant. Then, the mold fee is borne by the customer, and generally there is no additional design fee.

18.jpg


      Fan selection in electrical control cabinet

      The selection of fans in the electrical control cabinet mainly considers the normal working temperature du in the cabinet and the maximum ambient temperature outside the cabinet, and calculates a temperature difference, the air exchange rate of the fan, and the air capacity in the cabinet. After three data are known: temperature difference, air change rate and air capacity, calculate the time of air change in the cabinet, and then calculate the actual required air change rate through temperature difference. This selects the fan that is actually needed. Because the temperature drops at night, condensed water will be generated and attached to the circuit board in the cabinet, so the corresponding anti-condensation heater needs to be selected to maintain the temperature in the cabinet.

      According to the protection level of the equipment in the control cabinet, it is necessary to consider the dust-proof and moisture-proof functions of the control cabinet. The equipment generally used are mainly air conditioners, fans, heat exchangers, and anti-condensation heaters. At the same time, select equipment with different power according to the size of the cabinet.

掃碼咨詢

服務(wù)熱線18576680589

Shenzhen Yirongchuan Electronic Technology Co., Ltd
Tel.: 0755-33199478
Email: xiaoq.hou@yirongchuan.com
Address: Floor 4, Block A, Building 1, Hongfa Innovation Park, Jinzhujiao, Jiuwei Community, Hangcheng Street, Bao'an District, Shenzhen
Copyright @ Shenzhen Yirongchuan Electronic Technology Co., Ltd
Yue ICP Bei No. 13073947 備案圖標(biāo).png

YGZAB No. 44030602007107

亚洲国产av一级大全| 91少妇中出| 天天日天天骑天天操| 亚洲AV资源吧| 国产不卡福利一二三区| 青青操偷拍视频| 欧美日韩激情亚洲,亚洲国产精品| 啊啊啊日韩精品| 色香蕉播| WWW.操小穴| 国产av一区二区三区中| 欧美成人性视频久久久| 黑人操中国人中文字幕| 阿克| 韩国美女国产精品码乱A三级片 | 国产女明星操屄视频播放| 我好爽啊中文字幕嗯嗯嗯| 一区二区三区国产伦理电影| 抠逼视频一区二区| 91久久精品无一区二区三区| www操com| 日韩毛茸茸在线| 免费看干鸡巴| 大香蕉尹人日| 男女av大战| 大鸡吧插人妻av| 艹逼视频啊啊啊啊| 男女午夜爱爱| 国产精品欧美日韩涩爱| 国产AV一区二区三区精品| 亚洲丝袜制服诱惑在线| 亚洲熟女乱一区| 成人午夜插B| 欧州少妇视频| 不卡一区二区中文字幕| 一区二区老熟女| 黄色录像欧美日韩精品| 吃鸡巴视频免费在线观看| 华宁县| 白丝女生被艹| 欧美国产精品一二三看|